Attaching Ledgers to Engineered Rims; Durability of Cedars; Hidden Deck Fasteners

Q Are ledger lag-bolting schedules that were developed for 2-by rim joists adequate for engineered rims? It seems that lag bolts would be more likely to pull out of a thinner engineered rim than out of a thicker 2-by Doug fir rim joist. A Christopher DeBlois, a structural engineer with Palmer Engineering in Tucker, Ga., responds: You’re right. Lag bolts don’t get the same purchase in a 11/4-inch-thick engineered LSL (laminated strand lumber) rim joist as they do in 11/2-inch-thick framing lumber. If a lag bolt is properly installed, with its tip well through the rim joist and only

Register to download and view this article

Get your copy

No recommended contents to display.

Upcoming Events

  • Rising Trends: Home Elevators Add Luxury & Convenience 

    Webinar

    Register Now